Of the NPR 240 billion in economic assistance India has announced for Nepal, NPR 184 billion will be in the form of concessional loans and NPR 56 billion will be provided as a grant.
This means loans will account for 76.67 percent of the total assistance, while the remaining 23.33 percent will be a grant.
The breakdown was outlined in the joint statement issued following bilateral talks during Prime Minister Balendra Shah’s visit to India.
According to the Ministry of Foreign Affairs, of the assistance package announced by Indian Prime Minister Narendra Modi during a joint press conference, INR 35 billion (equivalent to NPR 56 billion) will be provided as a grant for post-flood reconstruction in the Bhotekoshi area.
The remaining INR 115 billion (equivalent to NPR 184 billion) will be provided through a Line of Credit (LoC), or concessional loan, according to the joint statement.
Nepal had requested INR 200 billion in financial assistance from India, comprising INR 100 billion in grants and an additional INR 100 billion in loans. However, the grant component of India’s announced package is lower than what Nepal had requested, while the loan component is higher.
Under the announced package, nearly three-quarters of the total assistance will come in the form of loans, with grants accounting for less than one-quarter. This means that most of the NPR 240 billion Nepal will receive will have to be repaid in the future under concessional lending arrangements.
The NPR 56 billion allocated for post-flood reconstruction in Bhotekoshi, however, is a grant and will not have to be repaid.